River Walkham - Huckworthy to Bedford Bridge

The Somerset Frome and Dorset Stour and westwards
Post Reply
User avatar
Mark R
Posts: 24134
Joined: Thu Jan 10, 2002 6:17 pm
Location: Dorset
Has thanked: 13 times
Been thanked: 15 times
Contact:

River Walkham - Huckworthy to Bedford Bridge

Post by Mark R » Sat Sep 13, 2008 4:03 pm

Last edited by Mark R on Mon Mar 18, 2013 10:52 pm, edited 2 times in total.

User avatar
daydoe
Posts: 26
Joined: Tue Sep 02, 2008 10:55 am

Tree at bottom of first weir

Post by daydoe » Mon Nov 17, 2008 3:44 pm

I was there a couple of weeks ago, below the first weir drop is a tree right across the river making it unrunable. can be portaged river left or possible down the middle of the island.

pacman
Posts: 16
Joined: Wed Aug 04, 2010 5:42 pm

Re: River Walkham - Huckworthy to Bedford Bridge

Post by pacman » Sun Mar 17, 2013 2:09 pm

Paddled this today (17.03.13) was a bit low at 50cm on gauge. 1 tree still across river about 100 yrds below first weir couldn't go under at this level so any higher could be a problem. No other hazards up to Bedford bridge.

donbarr
Posts: 58
Joined: Wed Oct 28, 2009 10:33 am

Re: River Walkham - Huckworthy to Bedford Bridge

Post by donbarr » Sat Nov 02, 2013 10:09 am

1.11.2013 completely tree free. Only 0.42 on EA gauge at Horrabridge so a bit scrapey at the put in but otherwise fine to paddle and an interesting extension to the main Walkham run. Also no sign of barbed wire mentioned in some guides.

pacman
Posts: 16
Joined: Wed Aug 04, 2010 5:42 pm

Re: River Walkham - Huckworthy to Bedford Bridge

Post by pacman » Thu Dec 26, 2013 3:27 pm

River wide tree down about 200m from Huckworthy bridge easy to see at todays levels (60cm) but will be a problem in high waters. branches stick up on river left to about 2m might be able to squeeze around the river right over the trunk. Would post a photo but lost camera today.

User avatar
Zool
Posts: 14
Joined: Tue Mar 27, 2007 10:53 pm
Location: Devon / North Yorkshire
Contact:

Re: River Walkham - Huckworthy to Bedford Bridge

Post by Zool » Thu Oct 23, 2014 9:56 pm

The EA are working at Horrabridge weir and its totally blocked with plastic tunnels in the water making a temp platform for a digger. A new salmon leap is under construction and there are large bags of stone in the water above the weir. Portage left into the park and stay well clear.

jam bo
Posts: 512
Joined: Fri Oct 09, 2009 6:33 pm
Location: T-Stock
Been thanked: 1 time

Re: River Walkham - Huckworthy to Bedford Bridge

Post by jam bo » Sat Dec 27, 2014 2:51 pm

Paddled today and clear all the way through. 0.38 on horrabridge gauge. Bit scrappy in places but ok on main features. A bit more water and could be a fun little blast.

Post Reply

Return to “England - Southwest”